Compact Receiver Brush
Estimated by: Nick Williams
OTIS TECHNOLOGY
6987 LAURA ST. LYONS FALLS, NY 13368
Part Number: replaces MO-324
PROCESS
Family Mold: No
Number of Cavities: 8 | Actual
Cycle Time (seconds): 12
Part Weights (grams): 2.2 | Actual
Part Weights (lbs): 0.00484
Runner Weight (grams): 13.3 | Actual
Runner Weight (lbs): 0.02926
Shot Weight (grams): 30.9
Shot Weight (lbs): 0.06798 | Actual
Regrind % Allowed: 10 | Estimate
Estimated Press Size (tons): 110
Press Size (tons): 130 | Actual
Press Cost (per second): $0.0175
PRIMARY LABOR
Operators Required: Yes
TERMS
Minimum Run Quantity: 5,000
FOB POINT: Naples, FL
Delivery Lead Time (# of weeks): 5
Payment Terms: net 30
Run Quantities (in thousands)
1: 50
2: 100
MATERIAL
Material Type: Nylon 6/6
Material Color: Black
Material Name / Spec #: N/A
Manufacturer / Supplier: Chase Plastics 21SPF
Hygroscopic (Dry?): Yes
Clear / Transparent: No
Light Colored: No
Pre-Colored / Pre-Mixed: Yes
Minimum Material Order (Pounds): 1,100.0
Cost ($ per Pound)
<1 M Pounds: 3.38
1M-5M Pounds: 2.3
5M-10M Pounds: 2.3
10M-Up Pounds: 2.21
Include Cost in Quote: Yes
PACKAGING
# of Parts in Box: N/A
Bulk or Layer Packed: Bulk
Boxes per Skid: N/A
Skid Cost: 35.0
SECONDARY'S
Operation Type #1: Manual Pull
Operation Type #2: Ream Hole
Labor Time for Op. #1 (Sec / Unit): 10
Labor Time for Op. #2 (Sec / Unit): 10
MOLD
Mold Cost: 20,000
Amortization Interval (M Shots): 200,000.0
Maintenance Cost ($ per Interval): 10.0
Maintenance Interval (M Shots): 1,000.0
COSTING
Mold Cost per part: 0.0125
Material Cost: 0.0195
Machine Cost: 0.0306
Part Cost: 0.0627