Compact Receiver Brush 

Estimated by: Nick Williams

OTIS TECHNOLOGY

6987 LAURA ST. LYONS FALLS, NY 13368

Part Number: replaces MO-324


PROCESS

Family Mold: No

Number of Cavities: 8 | Actual

Cycle Time (seconds): 12

Part Weights (grams): 2.2 | Actual

Part Weights (lbs): 0.00484

Runner Weight (grams): 13.3 | Actual

Runner Weight (lbs): 0.02926

Shot Weight (grams): 30.9

Shot Weight (lbs): 0.06798 | Actual

Regrind % Allowed: 10 | Estimate

Estimated Press Size (tons): 110

Press Size (tons): 130 | Actual

Press Cost (per second): $0.0175


PRIMARY LABOR

Operators Required: Yes


TERMS

Minimum Run Quantity: 5,000

FOB POINT: Naples, FL

Delivery Lead Time (# of weeks): 5

Payment Terms: net 30

Run Quantities (in thousands)

1: 50

2: 100

 


MATERIAL

Material Type: Nylon 6/6

Material Color: Black

Material Name / Spec #: N/A

Manufacturer / Supplier: Chase Plastics 21SPF

Hygroscopic (Dry?): Yes

Clear / Transparent: No

Light Colored: No

Pre-Colored / Pre-Mixed: Yes

Minimum Material Order (Pounds): 1,100.0

Cost ($ per Pound)

  • <1 M Pounds: 3.38

  • 1M-5M Pounds: 2.3

  • 5M-10M Pounds: 2.3

  • 10M-Up Pounds: 2.21

Include Cost in Quote: Yes


PACKAGING

# of Parts in Box: N/A

Bulk or Layer Packed: Bulk

Boxes per Skid: N/A

Skid Cost: 35.0


SECONDARY'S

Operation Type #1: Manual Pull

Operation Type #2: Ream Hole

Labor Time for Op. #1 (Sec / Unit): 10

Labor Time for Op. #2 (Sec / Unit): 10


MOLD

Mold Cost: 20,000

Amortization Interval (M Shots): 200,000.0

Maintenance Cost ($ per Interval): 10.0

Maintenance Interval (M Shots): 1,000.0


COSTING

Mold Cost per part: 0.0125

Material Cost: 0.0195

Machine Cost: 0.0306

Part Cost: 0.0627