LE T-Handle
Estimated by: Nick Williams
Otis TECHNOLOGY
6987 LAURA ST. LYONS FALLS, NY 13368
Part Number: MO-TRHDL-1
PROCESS
Family Mold: No
Number of Cavities: 2 | Actual
Cycle Time (seconds): 60
Part Weights (grams): 16.2 | Actual
Part Weights (lbs): 0.03564
Runner Weight (grams): 4.7 | Actual
Runner Weight (lbs): 0.01034
Shot Weight (grams): 37.1
Shot Weight (lbs): 0.08162 | Actual
Regrind % Allowed: 0 | Estimate
Estimated Press Size (tons): 110
Press Size (tons): 130 | Actual
Press Cost (per second): $0.0175
PRIMARY LABOR
Operators Required: Yes
TERMS
Minimum Run Quantity: 5,000
Delivery Lead Time (# of weeks): 5
Payment Terms: net 30
FOB Point: Naples, FL
MATERIAL
Material Type: ABS
Material Color: Black
Material Name / Spec #: RW-R-ABS-BLK
Manufacturer / Supplier: Chase Plastics HI-121-9059
Hygroscopic (Dry?): Yes
Clear / Transparent: No
Light Colored: No
Pre-Colored / Pre-Mixed: Yes
Minimum Material Order (Pounds): 1,100.0
Cost ($ per Pound)
- <1 M Pounds: 1.35
- 1M-5M Pounds: 1.35
- 5M-10M Pounds: 1.28
Include Cost in Quote: Yes
PACKAGING
# of Parts in Box: N/A
Bulk or Layer Packed: Bulk
Boxes per Skid: N/A
Skid Cost: 35.0
SECONDARY'S
Operation Type #2: Ream Hole
Labor Time of Op. #2 (Seconds / Unit): 10
Operation Type #1: Manual Pull
Labor Time for Op. #1 (Seconds / Unit): 10
MOLD
Mold Cost: 5,000
Amortization Interval (M Shots): 100,000.0
Maintenance Cost ($ per Interval): 10.0
Maintenance Interval (M Shots): 1,000.0
COSTING
Mold Cost per part: 0.025
Material Cost: 0.055
Machine Cost: 0.525
Part Cost: 0.605