LE T-Handle

Estimated by: Nick Williams

Otis TECHNOLOGY

6987 LAURA ST. LYONS FALLS, NY 13368

Part Number: MO-TRHDL-1


PROCESS

Family Mold: No

Number of Cavities: 2 | Actual

Cycle Time (seconds): 60

Part Weights (grams): 16.2 | Actual

Part Weights (lbs): 0.03564

Runner Weight (grams): 4.7 | Actual

Runner Weight (lbs): 0.01034

Shot Weight (grams): 37.1

Shot Weight (lbs): 0.08162 | Actual

Regrind % Allowed: 0 | Estimate

Estimated Press Size (tons): 110

Press Size (tons): 130 | Actual

Press Cost (per second): $0.0175


PRIMARY LABOR

Operators Required: Yes


TERMS

Minimum Run Quantity: 5,000

Delivery Lead Time (# of weeks): 5

Payment Terms: net 30

FOB Point: Naples, FL


MATERIAL

Material Type: ABS

Material Color: Black

Material Name / Spec #: RW-R-ABS-BLK

Manufacturer / Supplier: Chase Plastics HI-121-9059

Hygroscopic (Dry?): Yes

Clear / Transparent: No

Light Colored: No

Pre-Colored / Pre-Mixed: Yes

Minimum Material Order (Pounds): 1,100.0

Cost ($ per Pound)

  • <1 M Pounds: 1.35
  • 1M-5M Pounds: 1.35
  • 5M-10M Pounds: 1.28

Include Cost in Quote: Yes


PACKAGING

# of Parts in Box: N/A

Bulk or Layer Packed: Bulk

Boxes per Skid: N/A

Skid Cost: 35.0


SECONDARY'S

Operation Type #2: Ream Hole

Labor Time of Op. #2 (Seconds / Unit): 10

Operation Type #1: Manual Pull

Labor Time for Op. #1 (Seconds / Unit): 10


MOLD

Mold Cost: 5,000

Amortization Interval (M Shots): 100,000.0

Maintenance Cost ($ per Interval): 10.0

Maintenance Interval (M Shots): 1,000.0


COSTING

Mold Cost per part: 0.025

Material Cost: 0.055

Machine Cost: 0.525

Part Cost: 0.605